Om tjänsten

Besök hemsida
Omfattning Heltid
Publicerad 2024-04-09

I. Installation of clean room panels

• Scaling positions for placing panels with a laser meter according to the blueprint and plan given by the design team-according to the project (knowledge of reading project drawings).

• Placement of guides and U-profiles according to the drawn positions (base for the panel)

• Placing the panel:

o Smaller panel 3x1.2m weighing up to 75kg

o Larger panels up to 12m high - lifting by robotic arm and vacuum

The panels are screwed into each other.

• Installation of hangers and L-profiles for the ceiling; screws into the panel

• Hanging the ceiling, screwing and fixing it to make it as strong as possible

• Placing and screwing the holker into the ceiling and floor to close all voids and ensure solidity

• Installation of double-glazed windows

• Installing the door:

o Rolling doors

o Slide

o Regular

• Cutting holes for sockets and switches according to the project

• Siliconization of all joints and all elements

II. Installation of HVAC systems

• Creating channels for air flow

o Polyurethane styrofoam pieces are cut according to the blueprint and sorted

o Gluing the parts to form a channel

o PT3 tape is glued to the cones

o The flanges for connecting the ducts are tapped

o Siliconization of all joints

• The finished channel is placed on the ceiling

• Connection of HVAC units

• Screwing, installation of sealing tape and siliconization

• Each chamber has its own damper/valve to which the channel is attached:

o Sponge tape and silicone

• Installation of housing and HEPA filter

Tool handling:

1. Screwdriver

2. Sander

3. Hammer

4. Parakeets-pincers

5. Burgia

6. Tools for cutting aluminum

Operation of machines:

1. Forklift

2. Robotic arm

3. Lifting platform and equipment for working at height

Permit to work at height

Skicka ansökan

Mer info

Omfattning Heltid
Varaktighet 6 Månader eller längre
Antal platser 2
Lön Fast månads- vecko- eller timlön

Dela annons